WCC Trails Maintenence Report 2002

Wed. Dec. 25Jessica – Closed few shortcuts from the double track

 

Tue. Dec. 24Adam’s Run – The old steep eroded descent closed with big dead pine treesJessica (near the stone house ruins) – Rogue ghost trails closed with logs and debris

 

Tue. Nov. 26Igor’s Pass / The Bride – Placed 3 laminated signs stating the trail rules

 

Sun. Nov. 24Igor’s Pass / The Bride / Frankenstein – Used green camouflage spray paint to paint over the unauthorized orange markings that someone spray painted on many trees

 

Sat. Nov. 9Igor’s Pass (near the wrecked car) – Blocked the ATV passage with big logs

 

Sat. Nov. 2Double Bypass – A log pile replaced with an “A-Frame” to make it more difficult for ATVs to get over the big fallen tree trunk

 

Tue. Oct. 29Kamikaze – Spread kitty litter in to sand to harden the loose spots

 

Sat. Oct. 26Bootleg Trail – Boardwalk made for crossing over fallen pinesBootleg Trail – Finished the bend at the steep slopeSweet Street – Muddy spots repaired

 

Sun. Oct. 20Creepy Ridge – Trail’s end extended from the double track to the beginning of KamikazeAdam’s Run – Repairs madeBootleg Trail – Work done on new trail

 

Sat. Oct. 19The entire trail system – Corrugated plastic “No Motorized” signs posted on key locations

 

Sun. Oct. 13Twister (extension at the beginning) – Finished the new section

 

Sat. Oct. 12Twister (extension at the beginning) – Started creating the trail

 

Fri. Oct. 11.Igor’s Pass / The Bride – Removed the sapling stumps that were left after unauthorized widening of the trail

 

Wed. Oct. 9Drop Zone – Trail modified

 

Sat. Oct 5Sweet Street (end) / Dirtbowl – Big ATV barriers made out of logs

 

Wed. Oct. 2Rollercoaster / Dirtbowl – The entrances blocked with logs to inhibit ATVs

 

Sep./Oct.Jessica / Bootleg Trail / Monkey Boy – Created the trails

 

Mon. Sep. 30Creepy Corner – Made final touches to the new trail

 

Sat. Sep. 28Creepy Corner – Finished the trail

 

Fri. Sep. 27Creepy Corner – Nearly finished the trail

 

Thu. Sep. 26Creepy Corner – Started creating the trail

 

Wed. Sep. 25Twister – Finished the trail

 

Tue. Sep. 24Twister – Creating the trail Frankenstein - Started working on changing the last bend

 

Mon. Sep. 23Twister – Creating the trail

 

Sat. Sep. 21Rockin’ Ronnie – The rock bridge re-created over the landfill run-off creek, because the old one got destroyed in Landfill construction workFrankenstein – The big straight and steep descent changed in to more sustainable snaking switchbacksFrankenstein – Two switchbacks modified for better flow

 

Fri. Sep. 20Twister – Creating the trail Trail changes planned

 

Thu. Sep. 19Twister – Creating the trail

 

Wed. Sep. 18Twister – Creating the trail

 

Tue. Sep. 17Twister – Creating the trail

 

Mon. Sep. 16Twister – Started creating the trail

 

Sun. Sep 15.Igor’s Pass / Bride / Frankenstein – sapling stumps removedFrankenstein (far corner) – The first steep straight climb snaked up in to more sustainable switchbacks

 

Mon. Aug. 19Kamikaze – Finished the  changes for better flow

 

Sat. Aug. 17Kamikaze – The trail bends adjusted for better flow

 

Sat. Aug. 10Sweet Street (end) – Changed the steep descentSweet Street (end) – Logs removedSweet Street (half-pipe) – Changed for better flowKamikaze – Created the trail

 

Mon. Aug. 5Rockin’ Ronnie – A better rock bridge created over the landfill run-off creekIgor’s Pass – Fallen tree saw-cut and removedThe Bride (start) – Elevated the trail with soil

 

Mon. June 24.The Bride – Two 4x4s nailed on big fallen tree logs to narrow down the gap between them so the ATVs can’t pass throughRockin’ Ronnie – Further improved the rock crossing created over the landfill run-off creek

 

Fri. May 31Canal Bridge – Attempted to make a better bridge approach with snowmobile tracksRockin’ Ronnie – Improved the rock crossing created over the landfill run-off creek

 

Sun. May 12Igor’s Pass - Access to the new boardwalk createdRockin’ Ronnie (near the beginning) – Rock crossing created over the landfill run-off creek

 

Sat. May 11Igor’s Pas – Boardwalk created

 

Tue. May 7Double Bypass (end) – The reroute finished

 

Mon. May 6Double Bypass (end) – The trail rerouted for better connectivity

 

Sun. Apr. 28Canal – Finished the bridgeCanal – Crated access to the new bridge

 

Fri. Apr. 26Canal – Log-bridge creation started

 

Thu. Apr. 18Frankenstein – Created a small bridge over the lake drainage creekBride (near the end) – Trail rerouted to avoid a big pond from spring floodingIgor’s pass (start) – Slightly rerouted for better layout

 

Wed. Apr. 172x4s gathered for making boardwalks

 

Sat. Apr. 13Double Bypass (second half) – The trail rerouted to avoid the low areas that flooded in springFrankenstein (far end) – A corner changed

 

Sat. Apr. 6Double Bypass (at Igor’s Pass intersection) – Trail rerouted for better flow and connectivityAdam’s Run – Fallen trees removed

 

Fri. Mar. 29Rockin’ Ronnie (start) – Trail improvedDouble Bypass (end) – Made the access to log crossing over the canal

 

Sat. Mar. 16The Bride - Big fallen tree saw cut and removedFrankenstein – Fallen trees removedFrankenstein (the beginning) – Finished the trail reroute around spring floodFrankenstein (the entrance) – Changed for better flow and more intuitive direction choiceThe Bride (start) – Trail rerouted to make it more tight and difficult for ATVs to passSpiky Boy – Rerouted around big spring pond

 

Fri. Mar. 15Igor’s Pass – Big fallen tree saw-cut and removedIgor’s Pass (start) – The trail surface smoothed outIgor’s Pass – The ramps for two boardwalks improvedIgor’s Pass (near the car wreck) – The trail reroutedFrankenstein – The creek crossing improvedFrankenstein (near the end) – The trail rerouted around fallen treesFrankenstein (the beginning) – Started a trail reroute around spring flood

 

Sat. Mar. 9Igor’s Pass – Boardwalk created

 

Thu. Mar. 7Igor’s Pass – 2x4s for a boardwalk carried in

 

Sat. 26 Jan.Frankenstein - Trail adjustments madeThe Bride – Nails nailed into the bridge beams to make it saw safe

 

Sun. Jan 13The Bride – Finished the bridge

 

Sat. Jan 12The Bride – Bridge made over the drainage creek

 

Fri. Jan. 4Igor’s Pass – Finished the boardwalkCanal – Planks nailed on top of fallen tree to help people cross the canal