WCC Trails Maintenence Report 2003

Sat. Nov. 22Rocky Mountain – Rock pile created over a big fallen treeScrambler - Fallen trees saw-cut and removed

 

Sun. Nov. 16Raspberries – The trail closed because of it being a redundant shortcutScrambler – Smoothed out the bumps near the new rock bridge

 

Sun. Nov. 9Scrambler (the Rollercoaster’s double) – Finished the new trail

 

Sat. Nov. 8Rollercoaster – Creating the parallel trail

 

Thu. Nov. 6Rollercoaster – Creating the parallel trail

 

Wed. Nov. 5Rollercoaster – Creating the parallel trail

 

Tue. Nov. 4Rollercoaster – Creating the parallel trail

 

Sat. Nov. 1Rollercoaster – Started the creation of a parallel trailRollercoaster – Built a rock bridge for the new trail

 

Sat. Oct. 25Rollercoaster – Scouted the possibilities for a parallel trail

 

Wed. Oct. 15Stinky Girl – Finished the new trailStinky Girl – Big rock crossing improved by filling the gap between the rocks

 

Mon. Oct. 13Stinky Girl – Carried out wood and created a bridge over the creek at the low end of the gullyDouble Bypass – repaired the skinny bridge

 

Sun. Oct. 12The Pines – Painted over someone’s unauthorized orange markingsBootleg Trail – Big log saw-cut and removed

 

Thu. Oct. 9Stinky Girl – Created the new trail

 

Sun. Oct 5Double Bypass – Finished the trail change

 

Sat. Oct. 4Double Bypass – The first portion of the trail changed for better flow and connectivity

 

Tue. Sep. 23The Bride – New trail layout survey

 

Sun. Sep.  7Rollercoaster (beginning) – The bend changed for better flow

 

Sun. Aug. 31Jessica - A fallen tree removedTwister – The A-Frame over a log removed, and that straight ascent replaced with a more interested twisted up climb

 

Sun. Aug. 3The Bride – Unauthorized log pile removedRocky Mountain – The trail narrowed down to avoid widening around the big rock pileSweet Street – Bend changed for better flowBMX - Bend changed for better flowRoller Coaster – Few bends changed for better flow

 

Sat. Aug. 2Kamikaze – The wooden boardwalk-like slats removed because of the potential to be dangerousTwister – Two logs removed Kamikaze – Bend changed for better flowTwister – Roots removed

 

Sun. Jul. 13Kamikaze – 2 skids installed on to a high point of the half-pipe to eliminate the soft sandy spot

 

Sat. Jul. 12Kamikaze – One more skid taken to the spot

 

Thu. Jul 10Kamikaze – One skid taken to the trail, and the boardwalk improved

 

Sat. Jul. 5Kamikaze – Steep side slope re-enforced with boardwalk like wooden slats

 

Sat. Jun. 28Igor’s Pass – Fallen tree brunches cut and moved out of the way

 

Sat. Jun. 21Frankenstein / The Bride / Igor’s Pass / Double Bypass / Rollercoaster – Roots removedSweet Street – Two bends changed to avoid persistent mud

 

Sat. Jun. 6Frankenstein – A direction enforcing rock-step crated and a “One Way” sign installed

 

Sun. May 8Frankenstein – Removed a fallen tree

 

Sat. May 7First gully in the pines – Created barriers against descending in to the sides of the gully

 

Sat. May 31The Pines – Closed unauthorized steep descent lines

 

Fri. May 30The Bride (beginning) – Trail rerouted to avid a big muddy area

 

Thu. May 29Jessica - Fallen log saw-cut and removed

 

Sun. May 18Frankenstein – Culvert and rocks placed in the bottom of the woopty do, and the edges and reinforced with big rocks

 

Sat. May 17Frankenstein – A culvert taken to the woopty-doo

 

Thu. May 15The Bride (end) – Finished changing the descent

 

Wed. May 14The Bride (end) – Changing the descent

 

Sun. May 11The Bride (end) – Started changing the descent

 

Sat. May 10The Pines – Fallen trees removedBootleg Trails – The boardwalk over the fallen pines removed, and the pines cut and cleared out of the way

 

Sat. May 3Frankenstein (where the lake drains out) – Rock-bridge created over the creekFrankenstein - The second climb twisted up for better sustainability

 

Wed. Apr. 30Frankenstein – Lumber for boardwalks taken to the spot

 

Wed. Apr. 23Adam’s Run – Few sections improved

 

Fri. Apr. 18Frankenstein (near the end) – Bend changed for better flow

 

Sat. Apr. 12Jessica - Bends corrected for better flowAdam’s Run – Changed a bend for better flowTwister - Removed a fallen tree

Sun. Mar. 30.Adam’s Run – Finished the changes

 

Sat. Mar. 29Adam’s Run – Started working on changing and lengthening the trail

 

Sat. Jan. 18Rollercoaster – Trail changes planned

 

Sat. Jan. 11The Pines – Trail changes planned

 

Sat. Jan. 4Adam’s Run - New path opened to avoid the steep sandy downhill

 

Wed. Jan. 1Bootleg Trail (at the shack) – corner changed for better flowAdam’s Run – Started changing the bends at the sandy descent