WCC Trails Maintenence Report 2004

Sun. Dec. 26

Scrambler - 2 more laminated signs placed for deterring the use of the Dirt Bowl

 

Sat. Dec. 25

Bootleg Trail – A big fallen tree cut and removed

 

Sat. Dec. 4

Jessica - Fallen log removed

New Rockin’ Ronnie - The skid-bridge narrowed down

New Rockin’ Ronnie - One more narrow skid-bridge constructed

Scrambler - The old catwalk dismantled

Rocky Mountain, Twister, Bootleg Trail - 7 fallen logs from cut and removed

 

Sun. Nov. 28

New Rockin’ Ronnie - 4 skids wheel-barreled to the muddy spots

New Rockin’ Ronnie - Rerouted around the muddy area

New Rockin’ Ronnie – Skid bridge built over a stream

 

Sat. Nov. 27

New Rockin’ Ronnie  - A skid carried to the muddy spot

New Rockin’ Ronnie – The trailhead sign made more visible by clearing the tree branches around it

Bride – A big log cut and removed

 

Sun.  Nov. 21

Open Area on the South side of the Landfill - 10 laminated signs placed to help direct the traffic to the new entrance

 

Sat. Nov. 20

New and Old Entrances – 5 metal traffic signs placed

Spiky Boy, Rockin’ Ronnie – Blocked off and closed with logs and debris

New Rockin’ Ronnie – Completed

New Rockin’ Ronnie – Barbecue lunch served to the workers

 

Fri. Nov. 19

Metal signs purchased for diverting the traffic from Landfill’s South side

 

Sun. Nov. 14

New Rockin’ Ronnie – Many fence wires removed

New Rockin’ Ronnie – The switchback section layout finished

New Rockin’ Ronnie – Sections pre-raked

 

Wed. Nov. 10

New Rockin’ Ronnie - Big logs removed with a saw and the small branches cleared manually

Igor’s Pass - A huge fallen tree cut with a saw and removed

 

Sun. Nov. 7

New Rockin’ Ronnie – Marking finished and more clearing done

 

Sat. Nov. 6

New Rockin’ Ronnie - Marked out and partially cleared

 

Sun. Oct. 31

Adam’s Run – A big fallen tree removed

Scrambler (the end) – Rerouted to increase the distance and visibility to/from the Monkey Boy and lessen the temptation for short cutting

Scrambler (the end) - Narrowed down with huge logs

Sweet Street (the beginning) – A small mud hole filled in

Sweet Street - Rerouted around the slippery logs and a developing rut

 

Sat. Oct. 30

Rockin’ Ronnie (near the end in the forest) - A muddy Spot repaired with a Rolling Dip Grade

The Bride (mud/rock ramp to the bridge) – The lower muddy end repaired with big flat rocks

Stinky Girl (where it meets the fence) – The corner elevated with dirt

Stinky Girl (near the Landfill gate) – The recent reroute reversed do to being muddier than the old one

Stinky Girl (near the Landfill gate) – Muddy parts lined with rock, and/or elevated with a skid and a dirt ramp

 

Sun. Oct. 24

Monkey Boy (beginning) - Short reroute created around a mud hole

Old Rollercoaster now Monkey Boy (at the hill top) - Straight section buried with logs and replaced with a new twisty trail closer to the Gravel Pit fence

Scrambler - 4 mud holes filled with dirt and repaired with Rolling Grade Dips

Sweet Street – Extra soil shaved from the recently built rock filler

Sweet Street (near the end) – A big dead pine removed

Adam’s Run – A tight eroded corner rerouted

 

Sat. Oct. 23

Double Bypass (big bridge) – Log ramps built at both ends of the new bridge

Double Bypass (near the big bridge) - 3 holes filled with dirt an/or rocks

Double Bypass (near the Igor’s Pass) - Short reroute created around a mud hole

Double Bypass (in front of the log ramp) - Two mud spots lined with huge flat rocks

Double Bypass (close to the canal) - 4 mud holes filled with dirt

Double Bypass (near the canal) – Bridge hiding dirt mount’s approach improved with a log ramp

 

Fri. Oct. 22

Adam’s Run (beginning) - Bad ramp to the big log removed

 

Sun. Oct. 9

Rockin’ Ronnie - Dirt/log ramps built for safer crossing of the big boulder by the Landfill fence

Rockin’ Ronnie (at the entrance to the forest) - Big mud hole lined with rocks

Rockin’ Ronnie (at the Landfill gate) - Rerouted

 

Wed. Oct. 6

Rockin’ Ronnie - Work started on Dirt/log ramps for safer crossing of the big boulder by the Landfill fence

 

Sat. Oct. 2

Igor’s Pass – The first bridge moved, and new wood/soil/rock ramps built

Igor’s Pass - Trampled area around the first bridge covered up with debris

Bride - Big soil/rock ramp built at the end of the high bridge

Stinky Girl (the low section) - Muddy areas reworked by lining with logs or building up soil

Stinky Girl - Approach to the big rock improved

Stinky Girl (at double track crossing) - Short reroute around the mud

Frankenstein (North-East corner) – A rock bridge built across the canal

Bride (at double track crossing) - Dirt mount reworked to eliminate mud holes

Bride (at double track crossing) - Curve after the dirt mount rerouted

Bride - Big rock/dirt burm built to combat erosion from wheel dragging

Bride - Better ramps to the small bridge built

Double Bypass – The broken bridge replaced

Double Bypass / Frankenstein - Number of potholes filled in

Landfill Trails - Garbage collected

Frankenstein – The rock bridge by the lake expanded with more rocks/dirt

Frankenstein - Rooted muddy whoop-dee-doo rerouted

Frankenstein - Skid crossing removed and the trail diverted across the new the new bridge on the North/East end

Double Bypass - Workers received lunch provided by WCC, and prizes by King Street Cycles

 

Fri. Oct. 1

Double Bypass - Tree trunks for the new bridge trimmed to size

 

Tue. Sept. 21

Snyder Road Entrance - Culvert installed

Kamikaze - Few spots repaired

 

Mon. Sept. 20

Landfill Trails - Work planned for Oct. 2nd Trail Day

Frankenstein - 2 shortcuts closed

 

Mon. Sept. 13

Adam’s Run - 3 fallen logs removed

 

Mon. Sept. 6

Rocky Mountain (near the canal) - Exposed roots of a big tree covered up with dirt

Rocky Mountain (Sumac tree section) - Mud hole lined with rocks

Rocky Mountain (Sumac tree section) - Rerouted around a developing mud hole

 

Sat. Sept. 4

Double Bypass - Skinny Bridge "Chicken line" creek crossing lined with flat stones

Double Bypass - 3 mud holes filled with stones and/or dirt

 

Thu. Sep. 2

Double Bypass - Dry approach to the Skinny Bridge built out of rocks and dirt

Double Bypass - 4 mud holes filled with stones and/or dirt

 

Mon. Aug. 30

Igor’s Pass - Second bridge repaired

Double Bypass - Skinny Bridge repaired

Double Bypass (in front of the Skinny Bridge) - Mud holes filled in

Rocky Mountain (near the canal) - Big root removed and a mud hole filled in

 

Sat. Aug. 21

Kamikaze - 2 eroded spots repaired

Sweet Street - Eroded spot repaired

Adam’s Run / Sweet Street - 4 mud holes filled with rocks, 3 covered with wood

Twister - Fallen tree removed

 

Sat. July 10

Rocky Mountain - Bridge over the canal re-enforced

Scrambler (beginning) - “One Way” wooden sign posted

Scrambler - 4 “Regeneration Area” signs posted at the edges of the Dirt Bowl

Rocky Mountain (Sumac tree section) - Corner corrected

 

Fri. July 9

Forest between the power lines and Landfill - The rogue trail closed, the burm demolished, and the hole filled in

Forest between the power lines and Landfill – Reported about a 12" thick, live mature maple tree that was cut from all sides and left by rogue trail builders

 

Mon. July 5

Forest between the power lines and Landfill - A Fresh deep man made hole and a built up burm discovered

 

Thu. July 1

Rollercoaster / Scrambler - The last remaining private land sections closed

Rollercoaster / Scrambler - The closed sections replaced with a new trail

Rollercoaster / Scrambler (at the hill top) - The connection between two trails severed for better connectivity and flow

 

Mon. June 28

Rollercoaster / Scrambler - End of the Rollercoaster connected to the Scrambler, for directing traffic away from private land

 

Sat. June 26

Rollercoaster / Scrambler - The private land portions closed down

Under the hydro lines - A new trail built as a substitute for the lost portions of the Rollercoaster and Scrambler trails

 

Fri. June 25

Under the hydro lines - New trail roughed in for replacing the to be closed portions of the Rollercoaster and Scrambler trails

 

Mon. June 21

Rollercoaster - Field meeting with private landowner, in an attempt to solve the trespassing problem

 

Sun. June 20

Creepy Corner - Logs and debris (left after Region’s tree cutting) cleared from the trail

Twister - Fallen log cut and removed

 

Sat. June 19

Landfill Entrance / Snyder Road Entrance - Survey conducted from 8:00 am till 8:00 pm to document the number of trail users

 

Wed. June 16

Landfill Entrance / Snyder Road Entrance - Survey conducted from 5:00 pm till 8:00 pm to document the number of trail users

 

Sat. June 12

Rocky Mountain – Bridge over the canal (broken by dirt bikers) replaced with a new bigger one

 

Fri.  June 11

Frankenstein - 2 shortcuts closed

Twister - Shortcut closed

Rocky Mountain – Bridge over the canal (broken by dirt bikers) assessed for repair

 

Sat. June 5

Stinky Girl - Loose skids stabilized and 4 more skids moved over from the Bride trail

 

Fri. June 4

Creepy Corner - Field meeting to assess trail problems

 

Wed. June 2

Monkey Boy / Rollercoaster - 7 “Trail Closed” signs posted to prevent trespassing and conflict with private land owner

Rocky Mountain - Reroute around big fallen tree created

 

Tue. June 1

Creepy Corner - New triple switchback finished

Creepy Corner - Cut down tree removed

 

Mon. May 31

Creepy Corner - Trail diverted away from the fence construction

Creepy Corner - New triple switchback started

 

Sun. May 30

Sweet Street - 2 shortcuts closed

Double Bypass - Shortcut closed

 

Mon. May 24

Spiky Boy - 2 stone bridges rebuilt

Rockin’ Ronnie (forest section) - Muddy portions stone paved

Rockin’ Ronnie (by the Landfill gate) - Construction damage repaired

 

Sat. May 22

Rollercoaster - Muddy spots stone paved

Ron H., Michael Kuntz, Steve Shikaze,  Glen, Greg, Igor:

Old Raspberries Trail - Logs and debris piled to close the trail, for the third time

The Pines (near the hydro lines) - “Tank Barrier” against illegal motorized traffic erected

Bootleg Trail - Log pile built over a fallen tree

 

Thu. May 20

Double Bypass - Shortcut blocked

Old Raspberries Trail - Reopened section blocked again

Rollercoaster - Demolished rock-bridge rebuilt

 

Mon. May 10

Stinky Girl - Wet spot lined with logs and a long skid

Igor’s Pass - 2 mud holes lined with rocks

 

Sun. May 9

Sweet Street (near the end) - Steep shortcut from the top of the hill closed

Old Raspberries Trail - Huge amount of debris dragged on to the trail, in a second attempt to close it

Rollercoaster / Scrambler - Old access line to the Dirt Bowl closed

Adam’s Run - Trailhead rerouted to encourage correct direction choice

 

Fri. May 7

Close to Spiky Boy - Stone bridge built

Stinky Girl - 2 more skids placed on muddy spots

Double Bypass - Big Bridge’s loose boards repaired

 

Thu. Apr. 29

Frankenstein - 2 shortcuts closed

 

Sun. Apr. 25

Creepy Corner (near the end) - Rerouted from gravel pit’s private land

Kamikaze - Eroded slope packed down

 

Sat. Apr. 24

Frankenstein - Shortcut closed

 

Thu. Apr. 23

Bride (at the Stinky Creek) - 2 huge fallen tree trunks cut and removed from the creek to allow proper water flow and avoid trail flooding

Bride (at the Stinky Creek) - Log and mud levee built for keeping the trail dry

Igor’s Pass (near Bride intersection) - Huge half fallen tree trunk cut and removed, to clear the passage and prevent complete fall on to the trail

 

Thu. Apr. 15

BMX - Jump removed

 

Mon. Apr. 12

BMX - 2 unauthorized trails and 2 jumps removed

Twister - Jump removed

 

Mon. Apr. 5

BMX, Twister – 3 unauthorized jumps removed

Adams Run, Sweet Street, Twister – Fallen trees removed

 

Sun. Apr 4

Stinky Girl – Few more skids placed in wet spots

 

Sat. Apr. 3

Stinky Girl – Few skids placed in wet spots

Bride – Small dirt levee created along the stinky creek to prevent overflow to the trail

 

Sun. Jan. 4

Bootleg Trail – The end changed

 

Sat. Jan. 3

Adam’s Run – Few corners changed

 

Fri. Jan. 2

Rollercoaster – Corner at the whoop-dee-doo changed

BMX, Twister – 3 unauthorized jumps removed

Adams Run, Sweet Street, Twister – Fallen trees removed